BTR-100 is a water-based bitumen emulsion used as primer in waterproofing. The application surface should be free of dust, dirt, rust and oil, and loose parts scraped.
The application surface should be free of dust, dirt, rust and oil, and loose parts scraped. Pointed tips and sharp corners should be rounded.
Prior to applying the lining on surfaces to be insulated, surface smoothness, dryness and existence of sufficient slope finish should be controlled. When conditions are suitable BTR 100 is applied on the surface by means of a brush or spray gun so as to be 400 g per square meter and left until drying. When required, it may be used after diluting with water at a ratio of 20%. It dries within approximately 4 - 5 hours, depending on the weather conditions. In double layer applications, the second layer should not be applied until the first one is completely dry. Application of bituminous membrane is started after the primer is completely dry.
Averagely 400 g/m2, depending on the smoothness of the surface of application.
Bitumer BTR 100 is presented in 15 kg (net) plastic packages.
BTR 100 should be stored in a cool and covered place in a vertical position. It should not be exposed to sunlight.
When stored in its original package unopened in a dry and cool place, its shelf life is 12 months.
The data contained in this technical document is based on scientific knowledge. BTM A.Ş is only responsible for the product quality.
BTM A.Ş. may not be held responsible for other than recommendations on how and where to use the product and/or any improper use and consequences thereof.
BTM Bitümlü Tecrit Maddeleri Sanayi ve Ticaret A.Ş. Kemalpaşa O.S.B. Mahallesi Gazi Bulvarı No:152 35730 Kemalpaşa/İzmir TURKEY Phone:+90 232 877 04 02 Fax:+90 232 877 04 10 info@btm.co • www.btm.co